Project Reference

Solar Rooftop 750kWp, Highest safety measurement for petrochemical complex, Rayong Province

Regardless of system efficiency, system operation and exterior design, at Sitron Power, we are capable in handling project that located in the highly restrictive and/or hazard area such as power plant, chemical plant etc. We can align our client’s safety requirement with our own “Zero Accident policy” during installation, and operation period and be able reassure our reliability and excellence in engineering.